Ace Portable Accommodation
Ace Portable Accommodation
 

Ace Portable Accommodation Desidn Process
Below is a chart showing the different steps of obtaining your modular accommodation from the initial phone call to installation. There are a number of aspects to take into account and we can guide you through all of the necessary steps.

Let us take care of all aspects of your accommodation requirements.

Process Flow Chart We provide turnkey packages.
This means that we can take care of your building requirements from initial enquiry, design, through planning and offer a full civils package - drainage, electrical connection, water, ramps, IT, burglar and fire alarms, category 2 lighting, to ensure that your project is as worry-free a possible and completed to a fixed price, delivered on time.

Initial Considerations
Size of site
Site restrictions - this means things like existing buildings, limited access, trees in fact anything that will affect the location or access to the building. We will survey the site.

Design of Building for Educational Purposes
Do you need things like:

  • Store Rooms
  • Toilets
  • Disabled Access
  • IT
  • Carpets

We meet all safety requirements for classrooms etc. and provide to several county councils.
This means that our buildings meeting current building regulations.

Design of Office Building
Do you need things like:

  • Kitchen Facilities
  • Toilets
  • Disables Access
  • IT
  • Open Plan Areas
  • Meeting Rooms
  • Carpets

Design of on Site Accommodation
Do you need things like:

  • Mess Rooms
  • Canteen
  • Toilet Blocks
  • Dissabled Access
  • Drying Rooms
  • Non-slip Vinyl
  • Showers
  • Site Offices
  • Security Shutters
  • Door Grills
  1. Call office with your enquiry
    Tell us your requirements such as purpose of unit, how many people to work in each area. Do you need toilet facilities, kitchen, meeting rooms, server room, etc?
    Are there any restrictions to your site, meaning that the building will have to be of a certain size or configuration?
  2. Design and Quotation
    We will provide you with a design and quotation based on the information supplied.
  3. Site Assessment
    If the design and price are suitable for your requirements we will visit site to establish transport costs and whether or not a crane is needed. We can then assess the location of services (water, sewage, electricity) and provide you with a cost for connection along with pad foundations etc.
  4. Extra Site Work
    If you require extra works such as access ramps, car-parking etc, this can also be assessed at this point.
  5. Ordering and Delivery Date
    Buildings can be delivered 4- 8 weeks from point of order. This can vary however, depending on the current workload of production department. At this stage you will be asked to confirm the layout of the building and to sign our sales/ rental agreement.
  6. Planning
    Planning may also be required. As part of our turnkey package we can apply for planning permission on your behalf and liaise with council for inspections etc.
  7. Installation
    The units will be assembled in our workshop so that minimal disruption is caused on the site.
  8. IT
    Installation of IT points, cabling etc
Ace Portable Accommodation Home Page
Technical Information for Ace Portable Accommodation
Education for Ace Portable Accommodation
Constructions from Ace Portable Accommodation
Offices from Ace Portable Accommodation
Design from Ace Portable Accommodation
Contacting Ace Portable Accommodation
Ace Portable Accommodation Picture Gallery


Home | Technical Information | Education | Construction | Offices | Design | Picture Gallery | Contact Us

Ace Portable Accommodation, Castle Court, 6 Cathedral Road, Cardiff, CF11 9LJ
Tel: + 44 (0)8700 622333 Fax: + 44 (0) 2920 647579 Email: sales@aceforspace.co.uk

©2005 Ace Portable Accommodation      Web Design and Hosting by Century Web Design Ltd